2026 GeoChallenge

2026 Annual GeoChallenge

Edit

Are you ready to take on a real-world geospatial challenge? This year, NV5 is sponsoring the GeoChallenge to help students explore how geospatial technology, remote sensing, and applied analytics can support better decisions. Participants will develop an innovative workflow that demonstrates the practical value of geospatial data and tools, with the potential for deployment to a GeoAI platform.

Who Can Enter?
• Student chapter group submission
• NV5 employees or immediate family members are not eligible

Why Enter?
• Compete for Cash Prize: Top entry will be awarded a cash prize and one pass to the next Geo Week conference in Salt Lake City, Utah.
• Work with commercial GeoAI tools: Gain practical experience with ENVI®, ENVI® Agent, and NV5 analytic capabilities.
• Build for operational use: Create a workflow that is designed to be repeatable, documented, and useful beyond a class project or paper.
• Bridge academia and industry: Move strong technical work closer to real-world deployment and broader visibility.
• Develop agent-ready analytics: Learn how expert-authored workflows can become tools that higher-level AI agents can run on behalf of non-expert users.
• Showcase applied expertise: Demonstrate remote sensing, workflow design, validation, and communication skills to industry professionals.

Key Dates
• Submission deadline: December 18, 2026
• Judging results announced: January 15, 2027
• Winners showcased at Geo Week: February 23-25, 2027

Prizes
• Winner receives $2,250 + one 2027 GeoWeek Conference Pass 
• Prize-winning submission may be highlighted by ASPRS and NV5 through conference materials, web content, articles, social media, and/or other promotional channels.

Challenge Theme and Competition Definition
The NV5 GeoAI Challenge invites students to take on a real-world remote sensing problem: creating decision-ready wildfire burn perimeters from pre- and post-fire imagery. Participants will use Microsoft Planetary Computer data, ENVI, ENVI Agent, and NV5 analytic capabilities to build a reusable workflow that can identify burn scars, refine the results, and generate clean vector boundaries that represent the burned area.

Contestants will be given two wildfire locations to develop and test their workflows: the 2020 Pine Gulch Wildfire in Colorado and the 2026 First Point Fire in Florida. A third location will be held in reserve for judging so reviewers can assess whether each workflow performs consistently beyond the examples used during development.

This challenge is about more than detecting change in an image. Wildfire response organizations, utilities, insurers, and land managers need timely, usable fire perimeter information. Burn indices such as NBR and dNBR can highlight where change occurred, but the operational challenge is turning that change into a clean, contiguous boundary that can support real decisions.

Participants are expected to address the full workflow needed to produce a usable burn perimeter, including burn scar identification, thresholding or classification, noise reduction, polygon generation, boundary refinement, and validation. Strong submissions should minimize manual intervention and be designed to work across multiple wildfire events rather than being tuned to a single scene.

What makes this exciting?
Students will get to work on the kind of applied problem that geospatial professionals face in the field: turning complex imagery into information people can actually use. Top submissions may be presented to a broader industry audience through ASPRS, NV5, Geo Week, or other promotional channels, and may even be considered for future deployment through GeoAgent, NV5’s AI-powered geospatial platform.

Submission Requirements
Submit a concise brief in ArcGIS StoryMap. The brief should provide enough information for reviewers to understand the workflow, assess the results, and determine whether the approach is repeatable. The brief should include:


• Project summary describing the problem, approach, and results, Workflow documentation, including key processing steps and parameters used.
• One reproducible example, including input image source data, parameters used, and output results such as derived imagery products or feature layers.
• Validation summary describing how the output was evaluated.
• Explanation of how a non-technical user could use the workflow to produce usable outputs.
• Supporting code, notebooks, ENVI workflow artifacts, or other reproducible materials.


What You Will Be Given
• Temporary licenses or access to all required NV5 software packages
• Dedicated project kickoff session with members of the NV5 engineering or product management teams
• Open office hours with solutions engineers who can help with technical and non-technical questions

Judging Criteria

Criterion

What Reviewers Will Look For

Weight 

Repeatability

The workflow can be rerun consistently on similar data or AOIs.

35%

Analytic performance

The workflow effectively solves the defined challenge problem.

25%

Operational readiness

The output and workflow are realistic candidates for use in an operational setting.

15%

Communication

The submission clearly explains the value of the result for a non-expert user.

15%

Documentation

Methods, assumptions, parameters, and limitations are clearly described.

10%


The strongest submissions will demonstrate workflows that operate consistently across multiple images, acquisition dates, or geographic areas. Solutions that are highly tuned to a single image or scene may receive lower scores than workflows that produce reliable results across diverse datasets.


How to Enter 

a. Each group shall designate one point of contact for contest information and submission deadlines.  This project lead must be a current member of ASPRS, and have an active "MyASPRS" account.
b. Once registered, the POC will be requested to complete an additional survey of information about the team and their project.
c. The POC must submit the StoryMap link using the submission form included in the registration confirmation email no later than December 18, 2026.